Legal Disclaimer & Disclosures
Statutory information concerning solar energy generation yield calculations, PM Surya Ghar subsidy disbursement schedules, and official brand identity.
Disclaimer Index
1. Solar Energy Generation & Performance Yield
All solar electricity generation figures quoted on this website, in proposals, or via technical datasheets (such as 4 to 4.5 kWh/day per 1 kW installed capacity) represent estimates derived from Standard Test Conditions (STC: 1000 W/m² irradiance, 25°C cell temperature, AM 1.5 spectrum) and historical regional meteorological averages.
Actual real-world generation may vary depending on local micro-climates, seasonal rainfall, dust/soiling accumulation on panel glass, shading from adjacent trees or buildings, panel tilt angle, and local utility grid availability.
2. Financial ROI & Savings Calculator Estimates
Financial savings figures, payback periods (e.g., 3.2 to 4 years), and lifetime savings projections produced by our online Solar Calculator are illustrative estimations based on prevailing state electricity distribution utility tariff slabs and anticipated escalation rates. Urja Setu does not guarantee fixed financial returns, as DISCOM tariff structures and taxation policies are subject to periodic revision by State Electricity Regulatory Commissions (SERCs).
3. Government Subsidy & PM Surya Ghar Disclaimers
Central Financial Assistance (CFA) under the PM Surya Ghar Muft Bijli Yojana (up to ₹78,000 for residential rooftops) is an initiative of the Ministry of New and Renewable Energy (MNRE), Government of India.
4. Authorized Entity & Trade Partnership Disclosure
Urja Setu (https://www.urjasetuenergy.com) is operated by Gautam Communication (Proprietor: Debashis Chakravarty), which is an authorized solar services agency and distributor for APN Solar Energy Private Limited (CIN: U40106MH2019PTC328405). All commercial contracts, invoices, and billing receipts issued by this website are legal obligations of Gautam Communication.
5. DISCOM Net-Metering Feasibility & Inspection Timelines
The sanctioning of net-metering technical feasibility, distribution transformer (DT) load allocation, and bi-directional meter testing/installation schedules are executed by state distribution utilities (e.g. WBSEDCL, CESC, MSEDCL, UPPCL). While Urja Setu expedites all engineering liaisons, we are not liable for procedural delays arising from DISCOM administrative backlogs or grid capacity constraints.
6. Intellectual Property & Technical Accuracy
All logos, product images, datasheets, trademarks, and technical diagrams displayed on this website are the intellectual property of their respective owners (APN Solar Energy Pvt. Ltd. and OEM hardware partners) and are protected by applicable Indian copyright and trademark laws.